| Follow Us: Facebook Twitter Youtube RSS Feed

Development News

Environmental assessment clears way for phase two of West Toronto Railpath


When the West Toronto Railpath was first talked about back in 2002, it was possible to imagine a multi-use trail system running from the Junction right downtown right along the railway tracks to Union Station.

Though Metrolinx’s transit ambitions and condo development have over time limited the scope of where such a path can go, a long-awaited environmental assessment (EA) now points the way forward on how the path can be extended further toward the city centre. Phase one, which opened in 2009, provided a path from Cariboo Avenue to Dundas Street West. Phase two could extend the path to Abell and Sudbury streets relatively quickly.

“It is very exciting to have the EA closed so that Railpath 2 can finally move into the design stage,” says Scott Dobson, a member of Friends of West Toronto Railpath. “The great thing about the EA process is that frankly everybody loves Railpath. Everybody [who has seen it] gets it and wants to see it expand.”

For all extension possibilities beyond Abell, the EA calls for further study, leaving out Liberty Village. But Dobson says he’s pleased the EA cleared the way to get the path south of Queen, though between Dufferin and Abell the path will have to run adjacent to, not in, the rail corridor.

“There was no point in doing something that made nobody happy and strayed from the spirit of Railpath, but at the same time nobody wanted to stall the rest of the route up to Dundas where Railpath currently ends. So all stakeholders felt that getting it built to Abell, while continuing to explore southerly options, was the best option,” says Dobson. “A few years ago, nobody wanted land near or in the rail corridor but now that land is scarce and valuable. At the end of the day, it is because of increased density and new transit projects, which is a good thing. But figuring out the exact route has been time consuming.”

The next step is for an RFP to be tendered for detailed design of the extention. Beyond expansion south, Dobson says advocates are also in the early stages of looking north to go from the north tip of Railpath at Cariboo up to St. Clair Avenue.

Writer: Paul Gallant
Source: Scott Dobson
Signup for Email Alerts
Signup for Email Alerts